The benefits of precast were well utilised in Aquinas College’s new grounds maintenance compound. this 60m long enclosure sits at the end of one of the ovals at this prestigious school, and L-Block made for an excellent method of  retaining the 1.7m change in level from the playing field to the compound floor. The self-supporting characteristics of the L-Block system  made for an excellent solution to the Washdown bay walls within the compound. The material storage bins in the compound also utilised L-Block, making use of it’s modular construction to form bays of varying sizes. Cast-Tech Group Manufactured and delivered the precast units to site, and provided assistance to the earthworks team installing the panels onsite.